MST

MPW services for global chip teams

55nm MPW project enquiry

Start a 55nm prototype enquiry for logic, embedded-memory or mixed-signal requirements. MST organizes the process review, shuttle planning and written quotation around the samples and evaluation work your team needs.

Start with your work email and a short requirement. No account or design-file upload is needed.

HHGrace MPW SHUTTLE

HHGrace MPW shuttle windows 2027

Planned months per node.

Published months are planned shuttle windows, not GDS deadlines or sample delivery dates. The process option, submission deadline and delivery schedule are confirmed for each project.
NodeMonths
55nm2027 MPW monthly plan
JanPlannedMayPlannedSepPlanned
Request a 55nm MPW quote

What MST prepares with you

01

A defined process-review brief

We organize your application, node, design status and missing inputs so the responsible foundry can review the exact process option and NDA/PDK access path.

02

A written scope and quotation

The quotation identifies booked area, wafer or die delivery, quantity and acceptance assumptions. Dicing, packaging, probe and final test are identified as included or separately scoped.

03

A project milestone plan

We align the intended run with design-data handoff and manufacturing assumptions. Exact submission deadlines and sample-delivery milestones are confirmed for the accepted project.

TWO DETAILS

Send your MPW requirement

A work email and a short description are enough to start.

Do not send GDS/OASIS, RTL, netlists, source code or PDK files here.

The technical questions for this node

For 55nm, identify core and I/O voltages, required logic libraries and memory macros. An eFlash request should include capacity, endurance, retention and programming needs. The specific PDK and licensed IP must support the selected option; a node label alone does not establish flash, RF or BCD availability.

The first message can be preliminary. Die dimensions, sample quantity, PDK status, package and test assumptions help the later quotation. Keep confidential design files for the agreed NDA and transfer channel.

Read the detailed engineering guide in English →

55nm MPW enquiry questions

Can I enquire before my 55nm GDS is ready?

Yes. Send a work email and a short description of the intended prototype. State what is known and what is still open. Final GDS and verification evidence are part of the later controlled tapeout handoff.

Does the quotation include packaging and electrical test?

The written quotation defines that scope. Fabrication, dicing, package development, assembly, wafer probe, final test and characterization are separate work items. Describe the sample form and measurements you need so they can be scoped.

Are the displayed shuttle months delivery dates?

No. The table shows the maintained foundry planning windows for this node. Process eligibility, available capacity, booking and design-data deadlines, fabrication and downstream lead times are confirmed for the project.

What helps MST scope packaging and test?

When available, provide die size and thickness, pad or bump information, intended package and pinout, sample quantity, electrical limits and the measurements required. Detailed drawings and confidential files follow through the agreed private channel.

Prepare the next project discussion

MST coordinates process review, quotation and project follow-up. For HHGrace, MST acts as a non-exclusive customer-access and project-coordination agent. Foundry acceptance and the written project scope determine the work undertaken.

Content updated