MST

2027 mature-node MPW shuttle schedule

For a 2027 MPW plan, record the process option and the type of milestone. Reserve-by, final data, tape-in, tapeout and samples-out dates govern different parts of the schedule. Use the list below to shortlist routes and confirm project acceptance with the relevant operator.

MST Singapore · Sources checked

HHGrace planning windows

HHGrace MPW SHUTTLE

HHGrace MPW shuttle windows 2027

Planned months per node.

Published months are planned shuttle windows, not GDS deadlines or sample delivery dates. The process option, submission deadline and delivery schedule are confirmed for each project.
NodeMonths
90nm2027 MPW monthly plan
JanPlannedMayPlannedSepPlanned
55nm2027 MPW monthly plan
JanPlannedMayPlannedSepPlanned
Ask about a shuttle window

Examples of dates published by route operators

RoutePublished evidenceWhat to verify next
X-FAB XT018 · 180nm BCD-on-SOIThe 2027 calendar lists 1 February tape-in, 15 February data release and 26 July samples out for one XT018 run.Review the process modules and the latest calendar when preparing your submission.
DB HiTek BD130 · 130nmThe grouped BD130/RS13 row includes 24 February and 28 April as examples of tapeout start dates.Ask which listed date applies to the approved process and when your data must arrive.
TSMC 55nm via EuropracticeThe general 55nm CMOS logic, mixed-signal and RF route shows 16 May as the final-data deadline.Check the separate reservation and signed-quote milestones, project eligibility and selected process in the detailed sheet.
GlobalFoundries GlobalShuttleThe public calendar marks planning months for node/platform rows, including 55nm, 130nm and 180nm.Confirm the specific process module, demand condition and current timetable via GF Connect or the operator.

Prepare your process review

Before choosing a month
Confirm the exact process and PDK, eligibility, accepted die dimensions, minimum billable area and reservation requirements.
Before fixing a delivery plan
Record each deadline and its approval owner. Estimate probe, packaging, test fixtures and shipping separately from the wafer run.

MPW readiness checklist · Public MPW Access Map

For other foundry routes, contact the named operator directly.

TWO DETAILS

Send your MPW requirement

A work email and a short description are enough to start.

Do not send GDS/OASIS, RTL, netlists, source code or PDK files here.

Email the MPW engineering team

Compare IC test sockets for first-silicon bring-up.

Common planning questions

Are published dates firm delivery dates?

Read the milestone label and ask the operator to confirm the project schedule. A month in an indicative plan has a different meaning from a tapeout date or an estimated sample shipment.

Which MPW route does MST coordinate directly?

MST Singapore acts as a non-exclusive agent for overseas HHGrace MPW projects. Contact the listed operator to confirm access for the other published routes.

More MPW planning resources

Planning a 55nm or 90nm test chip without a foundry account?

MST helps startups, spin-offs, IP vendors and design houses evaluate paid HHGrace prototypes. You can request a fit check before you have an annual wafer forecast.

Contracting, eligibility and first steps
Who you work with
Moore Solution Technology Pte. Ltd. (Singapore UEN 202315239E) coordinates overseas HHGrace MPW enquiries as a non-exclusive agent. Your quotation identifies the contracting party and payment terms.
Project eligibility
We review the process option, parties, end use and destination for applicable trade controls before requesting foundry access.
Evaluating a second source
For an eFlash MCU or BCD power IC, share the IP, devices and voltage ratings your design needs. We can help identify what may need redesign or requalification.
What to send first
Send the node, required devices or memory, die dimensions, sample count and target month. Keep GDSII, RTL and schematics for the agreed secure channel.
  1. Process fit
  2. Eligibility & NDA
  3. PDK & window review
  4. Tape-in

January, May and September are 2027 planning windows. HHGrace confirms process options, PDK access and allocation after project review.