BCD MPW shuttle guide for 180nm, 130nm, 90nm and 55nm
BCD combines bipolar, CMOS and DMOS devices for mixed-signal and power ICs. For a BCD MPW, first match the device voltage, isolation and safe operating area to a named process option. Then check that option on a dated prototype run and request the minimum billable area.
MST Singapore · Sources checked
Public BCD process options and shuttle evidence
| Route | Published evidence | What to verify next |
|---|---|---|
| 180nm · X-FAB XT018 | X-FAB lists dates for its BCD-on-SOI shuttle. Its second-generation medium-voltage NLDMOS device family covers operating voltages from 5.5 V to 28 V. | Match the required SOI isolation and device module to the selected XT018 run. Check the latest PDK and module list. |
| 180nm · DB HiTek BD180XH / BD180XA | DB HiTek includes these variants in the 2027 analog and BCD calendar. | Ask DB HiTek which row applies to the variant and metal stack you need. |
| 130nm · DB HiTek BD130 and GF 130BCD | The DB HiTek calendar groups BD130 with RS13 at Fab 2. GF describes 5–40 V for 130BCD and lists 130nm platforms in its separate shuttle calendar. | Get the exact process code and current MPW option from the operator. Compare voltage classes at the same temperature and operating conditions. |
| 90nm · Hua Hong BCD | Hua Hong reported stable volume production of its 90nm BCD process. MST can coordinate an HHGrace process-fit enquiry. | Send the operating voltage, peak transient, current and isolation requirements. Confirm design rules, PDK option and the run during project review. |
| 55nm · GF 55BCD and UMC BCD | GF publishes 55BCD technology information. UMC has announced a 55nm BCD platform with thick-metal and embedded-memory options. | Start from the requested device and PDK option. A generic 55nm schedule is insufficient to establish eligibility for a particular BCD module. |
Prepare your process review
- Power stage
- Record operating and transient voltage, current, switching regime, temperature and pulse duration. Compare safe operating area and on-resistance at the same conditions.
- Isolation and interfaces
- State which domains must be isolated. Verify the isolation structure, level shifters, metal current limits, ESD, passives and package dissipation in the candidate PDK.
- Billable space and delivered samples
- Ask for accepted die dimensions, minimum allocation, eligible mask modules and sample quantity. Break out IP, additional process modules, dicing and test before comparing quotes.
MPW readiness checklist · Public MPW Access Map
For other foundry routes, contact the named operator directly.
TWO DETAILS
Send your MPW requirement
A work email and a short description are enough to start.
Do not send GDS/OASIS, RTL, netlists, source code or PDK files here.
Common planning questions
Which BCD node should I choose for a power-management IC?
Shortlist the named processes with the required power devices, isolation, passives and logic density. Check billable area and the available shuttle option after technical fit.
Does the HHGrace 90nm planning calendar confirm BCD for every window?
MST screens the proposed 90nm use case against the current plan. An eligible BCD option, design deadline, capacity and quotation are confirmed for the project.
More MPW planning resources
Planning a 55nm or 90nm test chip without a foundry account?
MST helps startups, spin-offs, IP vendors and design houses evaluate paid HHGrace prototypes. You can request a fit check before you have an annual wafer forecast.
Contracting, eligibility and first steps
- Who you work with
- Moore Solution Technology Pte. Ltd. (Singapore UEN 202315239E) coordinates overseas HHGrace MPW enquiries as a non-exclusive agent. Your quotation identifies the contracting party and payment terms.
- Project eligibility
- We review the process option, parties, end use and destination for applicable trade controls before requesting foundry access.
- Evaluating a second source
- For an eFlash MCU or BCD power IC, share the IP, devices and voltage ratings your design needs. We can help identify what may need redesign or requalification.
- What to send first
- Send the node, required devices or memory, die dimensions, sample count and target month. Keep GDSII, RTL and schematics for the agreed secure channel.
- Process fit
- Eligibility & NDA
- PDK & window review
- Tape-in
January, May and September are 2027 planning windows. HHGrace confirms process options, PDK access and allocation after project review.