55nm and 90nm eFlash MPW selection guide
Choose an eFlash MPW by the documented memory option and available macro. Start with capacity, write endurance and retention at operating temperature, then confirm programming and test access. Hua Hong reports volume production for 55nm eFlash. MST can screen 90nm eFlash enquiries for a project-specific route.
MST Singapore · Sources checked
What the public material establishes
| Route | Published evidence | What to verify next |
|---|---|---|
| 55nm · Hua Hong eFlash | The annual report records volume production of the 55nm eFlash platform. | Verify the exact flash macro and process option, programming supply, allowed temperature range and MPW window. |
| 55nm · UMC BCD with embedded flash | UMC identifies embedded flash as a technology option in its public 55nm BCD platform announcement. | Ask the operator which combination of embedded memory and power modules is available to prototype. |
| 90nm · eFlash enquiry | Hua Hong discusses BCD+eFlash across multiple nodes and reports 90nm BCD production separately. | MST can screen the memory requirement. Obtain confirmation of the specific 90nm flash option, macro, licences and run from the foundry. |
| 55nm · TSMC via Europractice | The published 2027 general entry is for specified CMOS logic, mixed-signal and RF variants. | For a memory-dependent design, ask for explicit confirmation of the eFlash process option and the PDK. Budget using the actual eligible allocation. |
Prepare your process review
- Storage and qualification
- State bits, write and erase granularity, target cycles, retention time, temperature profile, test strategy and whether the memory stores executable code.
- Macro and implementation
- Confirm the approved macro revision, endurance and retention evidence, IP rights, programming supply and manufacturing test access.
- Cost and run
- Compare booked area, IP and memory-module charges and delivery scope in writing. Use the applicable process and window when building a project budget.
MPW readiness checklist · Public MPW Access Map
For other foundry routes, contact the named operator directly.
TWO DETAILS
Send your MPW requirement
A work email and a short description are enough to start.
Do not send GDS/OASIS, RTL, netlists, source code or PDK files here.
Common planning questions
Can I use the same eFlash macro at 55nm and 90nm?
Confirm the macro is delivered for the exact process and PDK release. Verify its licence, corners, layout rules and programming flow with the operator.
What can I include in an early eFlash enquiry?
Share the intended memory use, estimated capacity, endurance and retention at temperature, target die size and quarter. Use the agreed protected channel for design files and licensed PDK material.
More MPW planning resources
- 55nm MPW enquiries
- 90nm MPW enquiries
- BCD MPW shuttle guide for 180nm, 130nm, 90nm and 55nm
- 2027 mature-node MPW shuttle schedule
- Commercial MPW routes and foundry PDK access for a first test chip
- MPW, multi-level masks and full masks at 55nm and 90nm
- From MPW bare die to first power-on with a small QFN lot
Planning a 55nm or 90nm test chip without a foundry account?
MST helps startups, spin-offs, IP vendors and design houses evaluate paid HHGrace prototypes. You can request a fit check before you have an annual wafer forecast.
Contracting, eligibility and first steps
- Who you work with
- Moore Solution Technology Pte. Ltd. (Singapore UEN 202315239E) coordinates overseas HHGrace MPW enquiries as a non-exclusive agent. Your quotation identifies the contracting party and payment terms.
- Project eligibility
- We review the process option, parties, end use and destination for applicable trade controls before requesting foundry access.
- Evaluating a second source
- For an eFlash MCU or BCD power IC, share the IP, devices and voltage ratings your design needs. We can help identify what may need redesign or requalification.
- What to send first
- Send the node, required devices or memory, die dimensions, sample count and target month. Keep GDSII, RTL and schematics for the agreed secure channel.
- Process fit
- Eligibility & NDA
- PDK & window review
- Tape-in
January, May and September are 2027 planning windows. HHGrace confirms process options, PDK access and allocation after project review.