From MPW bare die to first power-on with a small QFN lot
For 50 board-ready QFN samples, specify whether you need packages that pass visual inspection or units that also pass an agreed electrical test.
What to send for 50 QFN samples
Request a packaging and test quote| Input | What to include |
|---|---|
| Die delivery and map | For a whole wafer or diced wafer on tape, provide the wafer/die map, orientation and any probe bin results. For loose die, identify the lot or tray, orientation and probe status. |
| Die dimensions | Give length, width and thickness with units and tolerances. Identify the die drawing revision. |
| Pads and bond diagram | Provide pad opening dimensions, pad metal and the bond diagram (BPD) mapping die pads to QFN leads. Mark pin 1 and the exposed pad on the package outline. |
| Acceptance counts | Track incoming die, assembled packages that pass visual inspection, and units that pass the agreed electrical test. Record “untested” when electrical test is outside the order. |
| Input needed for 50 | For 50 visually accepted packages, add agreed assembly losses and set-asides to 50. For 50 electrically passing units, also allow for test rejects. Count each setup, destructive inspection or retained sample once. Confirm allowances for your lot. |
| Socket and existing PCB | Say whether you need a test socket and whether the existing PCB must be used. Include package outline revision, pitch, mounting pattern and available clearance. |
MST Singapore · Sources checked
Four handoffs between wafer delivery and first power-on
| Route | Published evidence | What to verify next |
|---|---|---|
| Shuttle operator to probe or assembly house | A wafer run, wafer probe and packaging can be separate orders. Europractice describes packaging as a service with options for prototypes and small series. | Record whether the delivery is a wafer, a diced wafer on tape, loose die or tested packaged units. Request die orientation, thickness, handling format and any probe or bin map. Budget sample reserve and the timing of each handoff. |
| Die owner to QFN assembler | A leadframe QFN can expose a die paddle on the underside. Amkor describes the construction and the range of package configurations; each has a specific outline. | Confirm die-to-cavity fit, pad-to-lead wire-bond map, bond-pad finish, paddle connection and pin 1 orientation with the assembler. Exchange controlled drawings through the project channel and agree a first-article inspection. |
| Package drawing to test socket and board | Two QFN48 examples are 6 × 6 mm at 0.4 mm pitch and 7 × 7 mm at 0.5 mm pitch. TI’s QFN board-attachment note treats the exposed pad and land pattern explicitly. | For a socketed board, check maximum body size and height, pin 1, exposed-pad contact, socket mounting holes and load limits against the selected socket drawing. For a soldered board, use the approved package land pattern. The footprints serve different purposes. |
| Assembled samples to the bench team | Packaging and electrical test are distinct deliverables. A package drawing establishes mechanical dimensions; the device owner supplies its electrical limits and test conditions. | Agree continuity and short checks, supply sequence and current limits from the approved device plan. Record unit or lot ID, board revision and instrument conditions for each observation. Use a known reference or test fixture before interpreting an unexpected reading. |
Prepare your process review
- For an IP validation chip
- Reserve measurement pins and test modes while defining the die. Identify which claims need measured results and over which voltage and temperature range. Keep the wafer position or sample identity with each characterization record.
- For an OEM or spin-off ordering 200 to 500 parts
- Write the quantity as electrically accepted packaged units or as untested packages. Agree whether destructive samples, assembly setup pieces and spare bare die count toward that quantity. Compare quotes for the same deliverable.
- For a repeat run
- Keep the approved bond diagram, package outline revision, socket drawing, PCB revision and approved test procedure together. Confirm whether a package or die revision changes any of those interfaces before reordering.
MPW readiness checklist · Public MPW Access Map
For other foundry routes, contact the named operator directly.
TWO DETAILS
Send your MPW requirement
A work email and a short description are enough to start.
Do not send GDS/OASIS, RTL, netlists, source code or PDK files here.
Common planning questions
Does booking a 55nm or 90nm MPW include QFN assembly?
Read the delivery line of the operator’s quote. For a wafer or bare-die delivery, obtain a separate assembly and test scope with the package type, deliverable count, expected yield assumptions and sign-off owner.
Can I order a QFN48 socket using pin count alone?
Send the package outline revision, maximum body dimensions, pitch, exposed-pad details and intended interface. Confirm pin 1, the socket footprint and the existing board’s mounting pattern before release.
More MPW planning resources
Planning a 55nm or 90nm test chip without a foundry account?
MST helps startups, spin-offs, IP vendors and design houses evaluate paid HHGrace prototypes. You can request a fit check before you have an annual wafer forecast.
Contracting, eligibility and first steps
- Who you work with
- Moore Solution Technology Pte. Ltd. (Singapore UEN 202315239E) coordinates overseas HHGrace MPW enquiries as a non-exclusive agent. Your quotation identifies the contracting party and payment terms.
- Project eligibility
- We review the process option, parties, end use and destination for applicable trade controls before requesting foundry access.
- Evaluating a second source
- For an eFlash MCU or BCD power IC, share the IP, devices and voltage ratings your design needs. We can help identify what may need redesign or requalification.
- What to send first
- Send the node, required devices or memory, die dimensions, sample count and target month. Keep GDSII, RTL and schematics for the agreed secure channel.
- Process fit
- Eligibility & NDA
- PDK & window review
- Tape-in
January, May and September are 2027 planning windows. HHGrace confirms process options, PDK access and allocation after project review.