MPW, multi-level masks and full masks at 55nm and 90nm
For first silicon, compare the price of the samples you can actually test. For a repeat order, ask which masks can be reused and how many wafers you must buy. A full mask becomes attractive when the savings per good unit cover the extra fixed cost within the planned order volume.
MST Singapore · Sources checked
Three ways an operator can allocate mask and wafer costs
| Route | Published evidence | What to verify next |
|---|---|---|
| Shared multi-project wafer | A shuttle shares mask and wafer costs across designs. The operator defines the process, accepted block size, calendar and sample allocation. | For a 50-sample bring-up, specify bare or packaged parts and the probe or final test required. Confirm the delivered allocation, rights to order more and next available run. |
| Multi-level mask (MLM) | With an MLM, several process layers share space on a reticle. X-FAB describes its prototyping options and Europractice lists MLM as a possible route to low-volume production. | For a 500-unit engineering lot, ask which layers share a mask, which changes require a new mask, and the wafer lot minimum. Obtain the operator’s confirmation that the exact 55nm or 90nm process supports this option. |
| Dedicated full-mask run | A dedicated quote separates mask-set charges from wafer orders. Prototype qualification, later production and repeat lots can have different commercial terms. | For a 100,000-unit forecast, compare order cadence, test yield, mask ownership, the cost of one respin and repeat-wafer pricing. TSMC uses NTO to mean new tape-out. Ask the supplier to list the masks and services included in its own quote. |
Prepare your process review
- Convert wafer starts into usable parts
- For an illustrative dedicated run, assume 250 gross die per wafer, 80% passing probe, and 90% passing assembly and final test combined. That gives 180 good units per wafer. A 500-unit request implies at least 3 wafers in this example. A 100,000-unit request implies at least 556. Round up again for the actual wafer lot, engineering reserve and yield variation.
- Put the two quotes on the same basis
- Add mask and engineering charges, fabrication, probe, packaging, final test and freight. Divide by the good units you expect to receive. For a shared shuttle use the operator’s committed sample allocation. Sample allocation cannot be calculated from a whole wafer’s gross die count.
- Find the break-even volume
- Divide the extra fixed cost by the saving per good unit. In a worked example, USD 60,000 of additional fixed cost and USD 2 of savings per good unit break even at 30,000 units. These are illustrative inputs. Substitute written quotes for matching deliverables and run the comparison again at a lower yield and with one mask revision.
MPW readiness checklist · Public MPW Access Map
For other foundry routes, contact the named operator directly.
TWO DETAILS
Send your MPW requirement
A work email and a short description are enough to start.
Do not send GDS/OASIS, RTL, netlists, source code or PDK files here.
Common planning questions
Does a 500-unit requirement automatically justify an MLM?
Get two written offers for the same delivered quantity. An operator may supply extra shuttle samples, require a dedicated lot or offer an MLM for only certain processes. Compare the landed totals and the cost of repeating the run.
Is there a published full-mask price for every 55nm or 90nm process?
Request the mask set, option layers, ownership and wafer minimum for your process. The 5 × 5 mm HHGrace prototype reference on MST’s site applies to that specific planning case. It cannot be extrapolated into a full-mask price or a price per production die.
More MPW planning resources
Planning a 55nm or 90nm test chip without a foundry account?
MST helps startups, spin-offs, IP vendors and design houses evaluate paid HHGrace prototypes. You can request a fit check before you have an annual wafer forecast.
Contracting, eligibility and first steps
- Who you work with
- Moore Solution Technology Pte. Ltd. (Singapore UEN 202315239E) coordinates overseas HHGrace MPW enquiries as a non-exclusive agent. Your quotation identifies the contracting party and payment terms.
- Project eligibility
- We review the process option, parties, end use and destination for applicable trade controls before requesting foundry access.
- Evaluating a second source
- For an eFlash MCU or BCD power IC, share the IP, devices and voltage ratings your design needs. We can help identify what may need redesign or requalification.
- What to send first
- Send the node, required devices or memory, die dimensions, sample count and target month. Keep GDSII, RTL and schematics for the agreed secure channel.
- Process fit
- Eligibility & NDA
- PDK & window review
- Tape-in
January, May and September are 2027 planning windows. HHGrace confirms process options, PDK access and allocation after project review.